Airport and Aviation Projects
Below is a summary list of projects completed by our firm. For specific details of projects listed please contact our office. Highlighted projects are included with links on left.
- Centennial Airport Kooi Hangar
- Boston Logan Airport TSA Security Checkpoint Upgrades
- Chicago O'Hare Airport TSA Security Checkpoint Upgrades
- Colorado Springs Airport TSA Security Checkpoint Upgrades
- Pueblo Airport TSA Security Checkpoint Upgrades
- Transportation Safety Administration (TSA)
- Denver International Airport (DIA) Canopy/Roadway
- Stapleton International Airport Concourses C & D
- (AGTS) UPS Room
Denver International Airport (DIA)
- DIA 78th Avenue Improvements
- DIA Commercial Vehicle Storage Facility
- DIA Terminal, Landside Terminal Complex (LTC)
- DIA Canopy Inverter Mechanical
- DIA Communications Center Break room
- DIA Terminal Smoke Fans Addition
- DIA FedEx Facility Expansion
- DIA On-Call Mechanical Electrical (ME) 2000
- DIA M/E Garage Daylight Adaptor
- DIA T1 Road Lighting
- DIA Concourse A General Services Administration (GSA)
- DIA Dollar Thrifty Site
- DIA Redesign of Main Terminal
- DIA Terminal Continental Tunnel Study
- DIA Terminal Automated Ground Transportation System
- DIA Terminal Grounding 5/6 Security
- DIA Terminal Skydance Art
- DIA Terminal United Modifications
- DIA Terminal Garage Addition
- DIA Terminal P/A System
- DIA Garage Revision to Existing Garage
- DIA Terminal Security Revisions
- DIA Terminal Curbside Fire Protection
- DIA Terminal Security Revision 2
- DIA Terminal F/A P/A Revision
- DIA Terminal Commercial Vehicle Staging
- DIA Terminal Curbside Shelters 5
- DIA Terminal Escalators/Elevators
- DIA Terminal Tenant Criteria Rep
- DIA Security Pavilion Furniture, Fixtures and Equipment Signage
- DIA Site Construction Service
- DIA Posting Drawings
- DIA Moving Cable Tray
- DIA Access Control Plaza
- DIA United, Level 3 Tenant Finish
- DIA United Main Terminal Fitup, UPS, and Communications Rooms
- DIA Rental Car Offices Re-design
- DIA Airport Operations ID
- DIA Terminal Rental Car Level 5
- DIA Terminal Ground Transportation Office
- DIA Terminal BAE Maintenance Facility
- DIA Terminal Luggage Storage, Level 5
- DIA Terminal Water Feature Integration
- DIA Baggage Power Distribution
- DIA Level 1, Area 11 A/C
- DIA Level 3, Communications Room
- DIA Level 1, 11 B/D Maintenance Shop
- DIA Site Services – On-Call
- DIA Indian Art Installation
- DIA As-Built Drawings
- DIA AGTS Train Maintenance Facility
- DIA AGTS Power Distribution
- DIA AGTS Communications System Revisions
- DIA AGTS Secured Barrier Wall (SBW) Addition of Conduit and Boxes
- DIA AGTS Equipment Room Special Systems
- DIA North Terminal Area (NTA)
- DIA NTA Fiber Optic Room
- DIA NTA Bridge Coordination
- DIA NTA 5th Floor Architectural Revision
- DIA NTA Public Service of Colorado Primary Duct Banks
- DIA NTA Westinghouse AGTS
- DIA NTA Park Administration Baggage
- DIA NTA Maintenance Administration Control
- DIA NTA Federal Airport Administration (FAA) Offices
- DIA NTA Denver Police Department
- DIA NTA Information Center
- DIA TCI High Definition Television
- DIA NTA Site Services
- DIA NTA As-Builts
- DIA Office Building (AOB)
- DIA AOB Coordination Command Center
- DIA AOB US West
- DIA AOB F/A P/A Security Revisions
- DIA AOB Security Gates
- DIA AOB US West Tenant Finish
- DIA AOB Furniture Revisions
- DIA AOB Site Services
- DIA AOB As-Built Drawings
- DIA Passenger Bridge
- DIA BAE Power Study
- DIA Construction Support Facility
- DIA Construction Support Expansion #2
- DIA AGTS Deep Time Deep Space
- DIA US West
- DIA Parking Ground Transportation
- DIA Power Load Analysis
- DIA United Ground Service Equipment (GSE)
- DIA United Hanger Facility
- DIA Continental GSE
- DIA Continental GSE Building Reduct
- DIA Continental Site Services
- DIA Continental In-Flight Kitchen
- DIA Continental South Site
- DIA Continental Hangar Systems
- DIA Continental North Site
- DIA Continental Estimating
- DIA Continental CAD Translations
- DIA Continental Express and Revisions
- DIA Continental Presidents Club
- DIA American Airlines Admirals Club
- DIA Continental Pneumatic Tubing
- DIA Smarte Carte Vending Equipment
- DIA Gary Sweeney Art Walls
- DIA Project Management Team (PMT) Art Work
- DIA Value Rent-A-Car, Terminal Building
- DIA Airport Concessions Warehouse Concourse C
- DIA Airport Concessions Concourse A
- DIA Backup Bags Modifications 2&3
- DIA Backup Bag Modifications 1w&1&2e
- DIA Alternate Bag Inbound Terminal
- DIA Alternate Bag Inbound Federal Inspection Service (FIS)
- DIA Alternate Bag, After Opening
- DIA United Terminal Bag Alternate
- DIA United/BAE Bag System Modifications
- DIA United/BAE Lighting Revisions
- DIA Alternate Bag Special Systems
- DIA Baggage Tunnel Lighting
- DIA Term Contract
- DIA Skydance Artwork & Lighting Control, Construction Administration
- DIA Press / Conference Room
- DIA Delongs Conference Room Remodel
- DIA Final Commissioning
- DIA AMR/Combs Hangar “A”
- DIA Cameras Level 6 United Airlines (UA)
- DIA American Airlines Ticket Counter
- DIA Surface Parking Lot Expansion
- DIA ME Term Contract 1996
- DIA ME #1 Turnstyle Building
- DIA ME #2 Ground Water
- DIA ME #3 Incinerator
- DIA ME #4 FIDS Level 4
- DIA ME #5 AGTS/UPS Rooms
- DIA ME #6 “C” Floor Repair
- DIA ME #7 Terminal Fountain
- DIA ME #8 “C” Floor Repair Construction
- DIA ME #9 Foam System Revisions
- DIA ME #12 Concourse A FAA K-9
- DIA ME #13 Fountain Redesign
- DIA ME #14 Concourse B Sprinklers
- DIA ME #15 AOB Miscellaneous Computers
- DIA ME #16 Miscellaneous Mechanical Project
- DIA ME #17 Utilities Tunnel Sump Pump
- DIA ME #18 Mechanical Design Standards
- DIA ME #19 Concourse Miscellaneous Mechanical
- DIA ME #20 Concourse A/B Fire
- DIA ME #21 Deluge Valve Addition
- DIA ME #22 Terminal Potable Water
- DIA ME #23 New Parking Lot
- DIA ME #24 Fountain Site Work
- DIA ME #25 Terminal Booster Pump
- DIA ME #26 Concourse A, B, & C Flex Connectors
- DIA ME #27 Concourse B Booth Relocate
- DIA ME #28 Concourse A Access Door
- DIA ME #29 AOB 7th Floor Remodel
- DIA ME #31 AGTS Administration Concourse C
- DIA ME #32 Training Room Concourse B
- DIA ME #33 Revision “C” Pump Room
- DIA ME #34 “A, B, C” Tug Room Ramps
- DIA ME #35 T Boost Pump Construction Docs
- DIA Baggage Maintenance
- DIA Baggage System Permanent Interface Ph 2
- DIA Phone Card Vending
- DIA – A Massage, Inc.
- DIA Elevators at Train Station
- DIA Modification 3E Oversize Baggage Lift
- DIA Modification 2W Baggage Lift Extension
- DIA Premises Wiring Study
- DIA United Mail Sort Conveyor
- DIA Terminal Modifications ½ West Level 5E
- DIA UA Bag Scanner / Conveyor
- DIA Concourse A and C Signage
- DIA Modification 1W Level 6 Transfer Unit
- DIA Lift Station
- DIA AGTS Maintenance Expansion
- DIA Concourse B West UA Mail Sort